Home Up Contents

P-51 page 3
Home Up P-51 page 4

 

P-51 page 4

 

 

 

 

 

 

 

 

E-mail me your comments.

 

October 14 - I have the landing gear blocks fabricated and put together with the gear door and metal bracket for the wheel. 

October 16 - The sheet metal for the cowlings showed up today.  A little longer than the "4-6 weeks for delivery", but it is here before I need it.  

October 20 - The seat bottom has strips on it to give the dihedral angle to the wings.

The wing fit into position.  And the landing gear in place .

Here it is really starting to take shape.

 On to Page 4

 

Last modified: January 10, 2003